Return to Bid Listings

Lions Water Treatment Plant Pump Station Intake Project

Expires: August 8, 2017 - 2:45 p.m.
Type: Bid

This project will install a new 16” high density polyethylene (hdpe) raw water intake pipeline from the old intake pump station to a point approximately 60 feet horizontally into the Mississippi River.  New pumps will be installed in conjunction with the installation of the new raw water intake. The project will include the installation of pipe piles at the location of the raw water intake in the river. The intake end of the pipeline will be fitted with a slotted intake manifold to filter debris from the intake water in order to project the pumps.  The project will also include the relocation of the electrical service to the pump stations.

Addendum No. 1 has been added.  Please review for changes to this project.

Addendum No. 2 has been added.  Please review for changes to this project.

Status: Active


  Lions Raw Water Intake - Advertisement for Bid 8 8 17.docx
  Bid Specs NO.14.007 7.12.2017.pdf
  Bid Drawings NO.14.006 7.12.17.pdf
  Bid Drawings NO.14.006 7.12.17 Reduced Size.pdf


  ADD. No. 3.1 8.1.17 PN DWLRF - 1095003-01.pdf - Updated 2017-08-02 10:59:31 -
  Addendum No. 3.2 8.3.17.pdf - Updated 2017-08-04 11:26:35 -

Return to Bid Listings